Dedicated Session CCS 5: Technical solutions for depleted fields

Tracks
CCS
Wednesday, October 29, 2025
1:50 PM - 3:30 PM
Rotterdam Hall 2

Details

Depleted hydrocarbon fields are high-priority assets for CO2 storage. Detailed geological knowledge and experience from the production phase create an excellent starting point for the development of a storage site. However, the reservoir pressure after production can be very low, resulting in a large pressure difference with the conditions in the transport system. Bridging this pressure gap while ensuring safe temperature levels throughout the injection and storage system is a real challenge. This session presents technical solutions that have been found by several storage projects. Depending on the specifics of the depleted field, the targeted injection rate and other factors, project developers have found multiple ways of bringing the CO2 from transport conditions to reservoir conditions and managing the associated cooling to acceptable levels. Project developers present the set-up of their system, focusing on how the elements of their system and the injection concept work together to develop a safe injection system. The line-up demonstrates that the list of injection system concepts and injection system elements for safe injection into (ultra-)depleted fields is growing. Future developers of depleted fields for storage can select the solution that best fits their requirements. The session opens with a presentation of the principles behind the challenge of storing CO2 in (ultra-)depleted fields.


Speaker

Mr Stefan Belfroid
TNO

Ultra-depleted fields: the physics explained, the challenge laid out

Agenda Item Image
Mr Marcel Bouts
EBN

The Porthos project: how to manage CO2 injection in a heavily depleted gas field

Caroline Combe
Shell

The L9 ultra-depleted gas field

Federico Cecchetti
ENI

The HyNet project

Ms Oana Maria Murariu
Expert
OMV Petrom SA-E&P, RO1590082

Low-pressure onshore gas field in Romania

Mr Perry Mureau
Senior Reservoir Engineer / Ccs Subsurface Lead
Totalenergies Netherlands BV

The L4-A project in NL offshore


Moderator

Panteha Bolourinejad
Senior Reservoir Engineer Ccs
Shell

Agenda Item Image
Filip Neele
TNO

loading