Field Trip 3: Large-Scale Testing of Offshore Structures at the TTH
Tracks
Side activities
| Friday, November 6, 2026 |
| 9:00 AM - 5:00 PM |
Details
Offshore support structures, including their foundations, account for approximately one-third of a wind farm’s total capital expenditure (CAPEX). Large-scale experiments are essential for optimizing design approaches and mitigating project risks, as they provide critical data for the validation of engineering models and project planning.
At the Test Center for Support Structures Hannover (TTH), geotechnical and structural steel tests can be conducted at near-full scale under controlled laboratory conditions, utilizing highly sophisticated measurement equipment. Furthermore, the Large Wave Flume+ (measuring 300 m in length, 5 m in width, and 7 m in depth) enables detailed investigations of hydrodynamic loads and soil mobilization effects (e.g., scour formation) by applying both waves and superimposed currents.